Mt. Sac Parking Structure Progress Report through 3/31/15

Home/Parking Structure March 2015/Mt. Sac Parking Structure Progress Report through 3/31/15

The construction team  has mobilized on the site and excavation for the storm drain line at the north has begun.

IMG_5627  IMG_5626

IMG_5625  IMG_5624