The Building 12 renovation included a full renovation of the 11,800 sf existing brick building that was originally built in the 1950’s. Structural upgrades and exterior and interior renovations were performed. Also included was the renovation of the existing building and adding classrooms, offices, two lecture rooms with stadium seating and restrooms as well as new finishes, electrical, mechanical and plumbing systems, a new roof and a new building exterior
There were site improvements to 2+ acres of site that included a new concrete elevator/stair structure and an LED illuminated concrete bridge to provide easy and convenient accessible pathways between Building 12 and the adjacent Building 13 and other site walks. New LED light fixtures were installed and benches with power outlets for charging handheld devices and laptops were added.The site work included extensive concrete walks, site stairs and ramps, seat walls and associated new landscaping.